Metal Injection Molding Cost
Compare lifetime cost using the same drawing and acceptance criteria
Read the full article and infographic ยท CSMFG powder metallurgy services
Transcript
Compare total cost
MIM cost includes fixed tooling and qualification plus the cost of making, finishing, and inspecting accepted parts.
Geometry changes the quote
Slides, cores, thick sections, and critical surfaces can change tooling, cycle time, handling, and machining requirements.
Include yield and finishing
Compare accepted-part cost rather than an unfinished nominal price. Include scrap, heat treatment, inspection, and secondary operations.
Calculate break-even carefully
For an illustrative extra fixed cost of twenty thousand dollars and a two dollar saving per accepted part, simple break-even is ten thousand parts.
Test volume scenarios
That example is not a quote. Forecast changes, maintenance, design revisions, and yield can change the decision.
Request comparable quotes
Send CSMFG the model, drawing, material, annual volume, and inspection requirements so alternatives can be compared on the same basis.